In the present paper is realised comparative analysis of a production system after it’s simulation using WinQSB and Extend software. Following the analysis and obtained results interpretation, conclusions are drawn and recommendations are made regarding possibilities for bottlenecks replacement.
Ključne reči : assembling; bottleneck; production cycle; waiting lines; FIFO
Tematska oblast:
Proizvodne tehnologije i inženjerstvo
Datum:
12.02.2013.
Br. otvaranja:
255