eKonferencije.com: TRANSPORT OF DEPOSITOR ARS1600(37+33+60)X18(O-V), ON THE P.K FIELD

TRANSPORT OF DEPOSITOR ARS1600(37+33+60)X18(O-V), ON THE P.K FIELD

1. Milica Leka, "Electric power industry of Serbia", RB Kolubara branch, Belgrade, Serbia

Open cast mine B and C are the oldest active mines in Kolubara coal basin. They are situated in Western part of basin between Field A (artificial border) and rivers Peštan and Turija (natural borders). Overburden is excavated with four systems, and coal with two levels connected with collecting conveyers and merges with coal excavated from coal system at Field D. All coal is transported toward Prerada (segregation).
Because of the dynamic of development of the coal basin there is often a need for transporting mining machines from one part of the basin to another.
This work gives an insight into transporting one of these machines, depositor, with a detailed showing of the depositor root and all of the following activities that go with the process.

Кључне речи :

Тематска област: Експлоатација минералних сировина и рударски технолошки процеси

Датум: 15.09.2017.

7th Balkan Mining Congress

Датотека уз рад  


Остали радови са конференције


Претражи радове

https://www.high-endrolex.com/10