https://www.high-endrolex.com/10

eKonferencije.com: GROUNDWATER MONITORING AFTER THE CESSATION OF LEACHING OF COPPER ORE IN THE OPEN-PIT MINE KAZANDOL MACEDONIA

GROUNDWATER MONITORING AFTER THE CESSATION OF LEACHING OF COPPER ORE IN THE OPEN-PIT MINE KAZANDOL MACEDONIA

1. Trajče Boševski, RUDPROEKT SKOPJE, Macedonia
2. Milinko Radosavljević, Mining institute, Belgrade, Serbia, Serbia
3. Vladan Čanović, Mining institute, Belgrade, Serbia, Serbia
4. Violeta Čolaković, Mining institute, Belgrade, Serbia, Serbia

Mining Institute of Belgrade has conducted the project of recultivation and landscaping of the area after the permanent cessation of mining operations of the copper cathode production complex Kazandol in Macedonia. The specific feature of the mine Kazandol is the exploitation of copper by ore leaching. The subject of this paper is one of the most important tasks within the project - a solution to the establishment of groundwater monitoring after the termination of the mining complex operations.

Ključne reči :

Tematska oblast: Logistički procesi i ekološki efekti

Datum: 08.09.2017.

7th Balkan Mining Congress

Datoteka uz rad  


Ostali radovi sa konferencije


Pretraži radove

https://www.high-endrolex.com/10